Barmouth North Promenade

JG Engineering appointed to carry out a large topographical survey of the existing Barmouth North Promenade to allow the designer and main contractor to prepare a flood defence scheme to prevent future flood in the area. The survey involved the initial letter drop of 350 house to let local residents know of the upcoming survey […]
A1 BIRTLEY – COAL HOUSE

JG Engineering were involved with the earthworks, working alongside Walters UK along a 4 km section of the A1 Birtley to Coal House. The project involved the checking, controlling and surveying of formation layers prior to stone placement and trimming the top of the subbase, checking and surveying the subbase prior to tarmac placement on […]
The Mendips Cabling Project – Hinkley Point Connection

The Mendips cabling project was a National Grid project connecting Hinkley Point Nuclear Power Station to the national grid. This is over 50 km of which 14 km ran through an area of natural beauty called the Mendips. Through this section of work the twelve separate 400KV cables had to be laid in trenches so […]
HS2 Calvert Interchange

JG Engineering where involved in HS2 at the Calvert interchange railway depot providing a surveyor & setting out engineer to Buckingham Group Contracting. JG Engineering were involved in carrying out topographical surveys as well as monthly volume surveys, managing GPS machine control and setting out of track drainage for the railway line.